Uptime-critical schedules cannot slip
Every CRAC, UPS and generator check is scheduled, evidenced and auto-escalated if missed.
Zero missed checks. Proof for every SLA.
CRAC, UPS and generator checks cannot be skipped, escalate on SLA, and export as insurer and client evidence — with change management intact.
Every CRAC, UPS and generator check is scheduled, evidenced and auto-escalated if missed.
Timestamped, photo-verified, named-staff checks replace third-party verification and protect contract terms.
Generators, UPS strings and CRAC units across halls and sites in one asset registry.
Temperature spikes, leaks and access breaches escalate automatically.
Work is generated from schedules, real-world events or ad-hoc requests, auto-assigned to the right team, and cannot be closed without its evidence.
5 of 5 workflows · Runs on a clock or calendar
0 of 5 workflows · Fires from a real-world trigger
0 of 5 workflows · Raised ad hoc by staff or public
Daily
Rack-inlet readings compared against ASHRAE limits with trends.
Weekly, full load quarterly
Voltage and impedance recorded so replacement moves from calendar to trend-based.
Weekly no-load, monthly full-load
Load-bank readings, fuel level and transfer-switch status captured per test.
Daily panel, monthly agent level
FM-200 / Novec agent levels and panel status with evidence.
Continuous + daily
Leak sensors plus a daily walk; access-log audit daily with monthly list reconciliation.
Each incident type carries its own severity, SLA, captured fields and escalation path — with every change logged.
Escalates to on-call engineering with the trend and minutes-above-threshold.
Pages the on-call team and records rack proximity for damage assessment.
Notifies engineering immediately and attaches the test history.
Alerts security with the access-list match and tailgate flag.
Value compounds as data accumulates. Here is the typical ramp after go-live.
Zero
Missed critical PM tasks
−10–30%
Cooling energy
Within SLA
Alarm acknowledgement
Calendar → trend
UPS replacement planning
Halls, CRAC, UPS and generator assets tagged; schedules live.
Escalation matrix enforcing SLA acknowledgements.
Cooling and battery trends drive energy and replacement decisions.
Client and insurer packs exportable on demand.
Evidence is captured as work happens and exportable for regulators, insurers and auditors in one click.
No. It proposes; certified engineers approve and execute under change management.
Every check is timestamped, photo-verified and attributable, exportable as SLA and insurer packs.
Yes — a centralised asset registry with per-tenant environmental data isolation.
Bring a floor plan and your compliance obligations. We'll map your hierarchy, generate a week of tasks and show the evidence trail end to end.